SNo | Subject | Reference No. | Date | Uploaded by | Uploaded on | Show |
1
|
Invitation for Feedback on Draft Energy Conservation and Sustainable Building Code (ECSBC) for Commercial and Residential Buildings and Draft Eco Niwas Samhita 2024
|
26(3)/ECSBC/E-9181057//CE CSQ (E)/2024/401-h
|
20.08.2024
|
RAMAYAN PRASAD GUPTA
|
20.08.2024
|
13.23 MB
|
2
|
Use of Energy service companies (ESCOs) as one of the methods of achieving energy savings in large commercial building- reg.
|
11(Misc.)CE CSQ (E)/E-9146692/2023/331-H
|
11.09.2023
|
VIKAS RANA ,CEE_CSQ
|
19.09.2023
|
3.56 MB
|
3
|
Regarding Registration and Processing of CPWD Projects in Green Rating System GHAR of CPWD.
|
9118563/32/CPWD/CSQ(E)/Green Rating Manual/2022/356-H
|
25.08.2022
|
VIMAL KUMAR,CE_CSQ
|
26.08.2022
|
0.25 MB
|
4
|
Installation of Solar PV System in GPOA and Non-GPOA CPWD managed building and Electrical Vehicle (EV) charging infrastructure in CPWD managed building.
|
9136380/11/Misc./CE CSQ (E)/ 2022/319
|
01.08.2022
|
VIMAL KUMAR,CE_CSQ
|
03.08.2022
|
12.47 MB
|
5
|
Star Rating of CPWD managed buildings as per MoU with BEE
|
No. 3144063/02/CE CSQ (E)/2021/45
|
22.01.2021
|
MARAM VENKATA CHALAPATHI RAO ,SE Elect.
|
22.01.2021
|
1.23 MB
|
6
|
Online Reporting System Module for Energy Efficiency Measures and Solar Power Measures Migration of data as per restructuring.
|
No. 9069448/02/ECC/ESCO/CE CSQ(E)/2021/41
|
20.01.2021
|
MARAM VENKATA CHALAPATHI RAO ,SE Elect.
|
20.01.2021
|
2.40 MB
|
7
|
INVITATION REQUEST- Signing of MoU between Indian Society of Lighting Engineers (ISLE) and Central Public Works Department on 10.12.2020 at 3.30 PM at CPWD Conference Room, Nirman Bhawan, New Delhi.
|
9085886/37(MOU)/CE/CSQ(E)/2020/ 371
|
08.12.2020
|
VIMAL KUMAR KHETAN ,EE Elect.
|
09.12.2020
|
0.75 MB
|
8
|
Rooftop Solar Power Plants on Govt. buildings under CAPEX/ RESCO model- SECI Scheme.
|
02/ECC/RESCO/CE (E)CSQ/2020-21/289
|
26.08.2020
|
CHAITANYA KUMAR VARMA
|
26.08.2020
|
4.00 MB
|
9
|
Innovation Challenge under FLCTD Program by CII in coordination with UNIDO and CII
|
9069100/01/ECC/ESCO/2019-20/181
|
15.05.2020
|
CHAITANYA KUMAR VARMA ,CEE_CSQ
|
15.05.2020
|
1.02 MB
|
10
|
Guidelines for Running of Air Circulation, Air cooling and Air conditioning Equipment during COVID-19
|
CE CSQ(E)/COVID-19/2020/028
|
13.05.2020
|
CHAITANYA KUMAR VARMA ,CEE_CSQ
|
13.05.2020
|
1.82 MB
|
11
|
Market Transformation strategy document for enabling energy efficiency in brick sector.
|
06/GIZ/CE CSQ (E)/2020/173
|
19.03.2020
|
CHAITANYA KUMAR VARMA ,CEE_CSQ
|
19.03.2020
|
0.33 MB
|
12
|
Estimation of impact of Infrastructures Schemes on mitigation of Greenhouse Gas (GHG) emissions- Data from Schemes/ Missions of MoHUA- reg.
|
3143824/02/ECC/ESCO/2019-20/174
|
19.03.2020
|
CHAITANYA KUMAR VARMA ,CEE_CSQ
|
19.03.2020
|
3.78 MB
|
13
|
Request for participation in BEE's Feasibility Study for Converting Existing Building to Nearly Zero Energy Buildings (nZEB)- reg.
|
9069100/01/ECC/ESCO/2019-20/172
|
18.03.2020
|
CHAITANYA KUMAR VARMA ,CEE_CSQ
|
18.03.2020
|
0.38 MB
|
14
|
Request for participation in BEE's Feasibility Study for Converting Existing Buildings to Nearly Zero Energy Buildings (nZEB)- reg.
|
9069100/01/ECC/ESCO/2019-20/135
|
27.02.2020
|
CHAITANYA KUMAR VARMA ,CEE_CSQ
|
27.02.2020
|
2.00 MB
|
15
|
Market Transformation strategy document for enabling energy efficiency of brick sector.
|
06/GIZ/CE CSQ (E)/2020/122
|
21.02.2020
|
CHAITANYA KUMAR VARMA
|
21.02.2020
|
19.67 MB
|
16
|
Star rating of CPWD manged building as per MoU with BEE - reg.
|
02/ECC/ESCO/2020/80
|
05.02.2020
|
CHAITANYA KUMAR VARMA ,CEE_CSQ
|
05.02.2020
|
0.42 MB
|
17
|
Air Quality Parameters for inside of the Buildings.
|
9082787/36(1)/CE CSQ (E)/2020/013
|
31.01.2020
|
CHAITANYA KUMAR VARMA ,CEE_CSQ
|
31.01.2020
|
1.67 MB
|
18
|
ECBC Awareness Program on Delhi Energy Conservation Building Code
|
08/Training/ CE CSQ (E)/2020/036
|
16.01.2020
|
CHAITANYA KUMAR VARMA ,CEE_CSQ
|
16.01.2020
|
0.68 MB
|
19
|
Memorandum of Understanding (MoU) between Deutsche Gasellsschaft fur Internationale Zosammenarbeit (GIZ) and CPWD signed on 12.12.320196- reg.
|
06/GIZ/CE CSQ (E)/2019/011
|
16.01.2020
|
CHAITANYA KUMAR VARMA ,CEE_CSQ
|
16.01.2020
|
0.38 MB
|
20
|
Memorandum of Understanding (MoU)between Deutsche Gesellschaft fur Internationale Zusammenarbeit (GIZ) GmbH and CPWD signed on 12.12.2019- reg.
|
06/GIZ/CE CSQ (E)/2019/002
|
02.01.2020
|
CHAITANYA KUMAR VARMA ,CEE_CSQ
|
02.01.2020
|
0.87 MB
|